11.07.2014 // New production hall
In 2013 GarnTec concluded a contract for a new project. Since the existing production capacity is no longer sufficient for this project, it was decided together with the parent company – Julius Glatz GmbH – to build a new production facility to meet all requirements. The hall was built according to the latest energy guidelines (including a photovoltaic system) and is equipped with the most modern machinery to ensure efficient production.
In the meantime, the hall has been completed and the production is well utilized.